POSTURE, PLAINLY STATED

COMPLIANCE SIGNALS

In progress beats silence. Every line below is a current, honest status — nothing here implies a certification we don't hold.
LAST UPDATED 2026-08-18
AREASTATUSWHAT IT MEANS
NDAA §848 / COVERED COMPONENTS DESIGN RULE — BOM VERIFICATION PENDING No covered PRC-origin components. Applied as a design rule to every concept BOM; formal verification lands with first article builds.
BLUE UAS FRAMEWORK ROADMAP Integration concepts specify Blue-UAS-listed airframes and components where they exist; framework listing is a roadmap item, not a claim.
ITAR / EXPORT CONTROL DETERMINATION PENDING Commodity-jurisdiction posture under review before any technical data leaves U.S. persons. No exports contemplated in current phase.
CMMC LEVEL 1 SELF-ASSESSMENT PLANNED FCI-only posture today. Level 1 self-assessment scheduled ahead of first federal contract; no CUI is handled.
NIST 800-171 / SPRS PLANNED (PRE-CUI) Gap assessment planned before any CUI-bearing work is pursued.
MADE IN USA / BERRY POSTURE DOMESTIC BOM BY DESIGN Domestic chassis and U.S./allied-built components specified across concepts (see Trench Daddy, RC-01 demo rig).
QUALITY SYSTEM (ISO 9001 / AS9100) ROADMAP Documented work instructions now; certification pursued when production volume justifies it.